Industrial Facility Data Center Operations

  |     |   No comment

Our customer, a Fortune 100 company, has three data centers that carry 60% of their business traffic each day, and as a $66 billion company, that means $40 billion a year runs through their data centers. With such large data centers, our customer needed to outsource their...

Read More

Relocation of 220,000 SF of Manufacturing Equipment

  |     |   No comment

A Fortune 100 Company was consolidating two manufacturing facilities and needed to relocate over 300 pieces of equipment that encompassed 220,000 SF of space. Challenge The relocation required shipments to travel over a 1,200 mile distance, with 27% of the equipment reinstalled at an international location. Due...

Read More

Large Scale Machine Relocation

  |     |   No comment

Kroeschell utilized ISO: 9000 methodology to relocated more than 200 pieces of heavy manufacturing equipment over a 750 mile distance. Challenge A Fortune 100 company was undergoing a plant consolidation and needed to relocate more than 200 pieces of heavy industrial and manufacturing equipment over a 750...

Read More

Clean Room Construction

  |     |   No comment

When it came to creating a highly controllable clean room for one of our largest clients, the Kroeschell team went to work building a room that would exceed expectations in every way. Challenge A client’s factory contained a dilapidated area known as “the black dungeon” and they...

Read More

Operational Overhaul in Wastewater Treatment Plant

  |     |   No comment

Kroeschell was challenged by a client to reduce the $1,200,000 operation cost of their Industrial Wastewater Treatment Plant. Kroeschell rose to the challenge and surpassed their expectations. Challenge Kroeschell was approached by a customer and challenged to reduce the operations cost associated with the Industrial Wastewater Treatment...

Read More

Solvent Recovery System

  |     |   No comment

By helping one client solve a solvent problem, we also helped them make a positive impact on the environment. Challenge A major client was bringing in an average of 22 barrels of new solvent per month, at a cost of (at that time) $800 per barrel, while...

Read More

Machine Relocation

  |     |   No comment

Machine moves and new installations can be costly and time-consuming – but not when you are working with Kroeschell, as one of our clients found out. Challenge A Kroeschell client has periodically needed a new machine to be installed and old machines to be relocated within a...

Read More

Waste Coolant Recycling System Installation

  |     |   No comment

A Kroeschell client was shipping 1,700,000 gallons of waste coolant off-site for treatment and disposal. In efforts to lessen their environmental impact and increase efficiency, Kroeschell developed and implemented a system that cut costs through recycling. Challenge Our client was paying over $300,000 per year to dispose of...