Archive

Major Mechanical Upgrades at Motorola Corporate Tower

  |     |   No comment

Motorola consolidated their business campus from nine buildings to two, relocating the majority of their business functions to its Corporate Tower. This prompted the remodel of all 12 floors to accommodate increased cooling capacity. Over the course of four years, Kroeschell completed a three-phase HVAC...

Read More

Air Force Base Domestic Water Heating Upgrades

  |     |   No comment

Over the years, a building’s usage had changed on an Air Force Base, and the old domestic water heating system was now proving to be an inefficient means for generating hot water. Kroeschell provided a turnkey solution that minimized downtime and increased the Base’s Energy...

Read More

Goose Island Brewery Process Upgrade and Expansion

  |     |   No comment

[vc_row row_type="row" text_align="left" css_animation=""][vc_column][vc_column_text] Challenge Goose Island Brewery has become known for its unique barrel-aged brews including the popular Matilda, Sofie and Juliet. With the steady increase in demand from the marketplace, Goose Island recognized that they needed to increase their production capacity for this type of...

Read More

Alerton Controls Installed at McGuire Air Force Base

  |     |   No comment

McGuire Air Force Base was in need of Kroeschell's expertise to install new temperature controls and a direct digital controls (DDC) system to their clinics. Challenge McGuire Air Force Base was in need of new temperature controls and a direct digital controls (DDC) system to their medical, biomedical...

Read More

Chiller System Replacement at a Corporate Headquarters

  |     |   No comment

[vc_row row_type="row" text_align="left" css_animation=""][vc_column][vc_column_text] Challenge A customer’s headquarters, located in Northbrook, IL was operating with a 20-year-old chiller system that had reached the end of its useful life and needed to be replaced. Kroeschell was selected to perform the multi-million dollar plan and specification project to install...

Read More

HVAC System Upgrade at Fairchild AFB

  |     |   No comment

Challenge The 92nd MDG clinic at Fairchild Air Force Base needed to increase their energy efficiency and bring existing air handling units (AHU) into compliance as the return air system was using life safety egress corridors to send air back to the AHU instead of using...

Read More

HVAC and BAS Upgrade at 21st Medical Group, Schriever AFB

  |     |   No comment

The 21st MDG at Schriever Air Force Base was experiencing airflow deficiencies in spaces throughout their medical facility. The system was struggling to satisfy the heating and cooling needs during both summer and winter seasons. Challenge The challenges the facility faced included: Many of the perimeter offices...

Read More

Medical Clinic Renovations at Scott Air Force Base

  |     |   No comment

Challenge The 932nd Aerospace Medicine Squadron, along with two other squadrons, were collocated in a lower level of a hospital building at Scott Air Force Base. Lack of space was a common obstacle as the number of personnel assigned to squadrons continued to grow. To alleviate the overcrowding...

Read More