Lutheran General Hospital Controls Retrofit

  |     |   No comment

Kroeschell installed new combustion controls for the boilers at Lutheran General Hospital that resulted in significant increases in efficiency, performance and flexibility. Challenge Advocate Lutheran General utilizes (2) 600 HP and (2) 800 HP high-pressure steam boilers providing steam to the main hospital and professional building complexes....

Read More

Industrial Facility Data Center Operations

  |     |   No comment

Our customer, a Fortune 100 company, has three data centers that carry 60% of their business traffic each day, and as a $66 billion company, that means $40 billion a year runs through their data centers. With such large data centers, our customer needed to outsource their...

Read More

Facility Maintenance at George W. Bush Library

  |     |   No comment

Kroeschell provides facility maintenance services for the George W. Bush Presidential Library and Museum. Challenge The George W. Bush (GWB) Presidential Library and Museum aimed to be the first presidential library to achieve The U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) platinum certification. When construction of...

Read More

Facility Maintenance at Nixon Presidential Library

  |     |   No comment

Kroeschell provides The Nixon Presidential Library and Museum with facility maintenance services. Challenge The Nixon Presidential Library and Museum experienced difficulties with responsiveness, flexibility and quality of services from their previous facility maintenance provider. They were in need of a strict pest control plan, better security monitoring, improved...

Read More

Major Mechanical Upgrades at Motorola Corporate Tower

  |     |   No comment

Motorola consolidated their business campus from nine buildings to two, relocating the majority of their business functions to its Corporate Tower. This prompted the remodel of all 12 floors to accommodate increased cooling capacity. Over the course of four years, Kroeschell completed a three-phase HVAC...

Read More

Regus Business Center 11th Floor Renovation

  |     |   No comment

Challenge The Regus Business Center, located in Colorado Springs, CO, required a complete renovation of all the common spaces throughout the 11th floor of the building, totaling 13,000 SF. Kroeschell needed to execute all phases of construction in such a way that the entire floor would...

Read More

Field Museum of Chicago

  |     |   No comment

Through a preventive maintenance program and selective downtime, Kroeschell provided unsurpassed service and support to the Field Museum for more than 60 years. Challenge The Field Museum is home to irreplaceable artifacts and priceless collections that require an extremely controlled environment to maintain their sensitive state. The...

Read More

Advocate Lutheran General Hospital

  |     |   No comment

Maintaining machinery and equipment is important to the operations for any company, but especially so for hospitals. To ensure the reliability of their critical machinery, Lutheran General Hospital contracted with Kroeschell to provide complete machine maintenance services. The Problem In the past, Advocate Lutheran General Hospital has...

Read More

Relocation of 220,000 SF of Manufacturing Equipment

  |     |   No comment

A Fortune 100 Company was consolidating two manufacturing facilities and needed to relocate over 300 pieces of equipment that encompassed 220,000 SF of space. Challenge The relocation required shipments to travel over a 1,200 mile distance, with 27% of the equipment reinstalled at an international location. Due...

Read More