Archive

Lutheran General Hospital Controls Retrofit

  |     |   No comment

Kroeschell installed new combustion controls for the boilers at Lutheran General Hospital that resulted in significant increases in efficiency, performance and flexibility. Challenge Advocate Lutheran General utilizes (2) 600 HP and (2) 800 HP high-pressure steam boilers providing steam to the main hospital and professional building complexes....

Read More

Advocate Lutheran General Hospital

  |     |   No comment

Maintaining machinery and equipment is important to the operations for any company, but especially so for hospitals. To ensure the reliability of their critical machinery, Lutheran General Hospital contracted with Kroeschell to provide complete machine maintenance services. The Problem In the past, Advocate Lutheran General Hospital has...

Read More

Rush University Medical Center

  |     |   No comment

When you are one of the nation’s leading research and care facilities, maintaining critical operations 100% of the time is a top priority. That’s the challenge Rush University faced and the reason they contracted with Kroeschell. Challenge Rush University Medical Center recently underwent a major renovation of...

Read More

Air Force Base Domestic Water Heating Upgrades

  |     |   No comment

Over the years, a building’s usage had changed on an Air Force Base, and the old domestic water heating system was now proving to be an inefficient means for generating hot water. Kroeschell provided a turnkey solution that minimized downtime and increased the Base’s Energy...

Read More

Building Automation System Installed at UIMC

  |     |   No comment

[vc_row row_type="row" text_align="left" css_animation=""][vc_column][vc_column_text]University of Illinois Medical Center (UIMC) was making a major investment in the infrastructure of their hospital, and part of the remodel included new building automation controls. Challenge The original system was antiquated, dampers were missing and there were leaks in the pneumatic system. UIMC bid the...

Read More

HVAC and BAS Upgrade at 21st Medical Group, Schriever AFB

  |     |   No comment

The 21st MDG at Schriever Air Force Base was experiencing airflow deficiencies in spaces throughout their medical facility. The system was struggling to satisfy the heating and cooling needs during both summer and winter seasons. Challenge The challenges the facility faced included: Many of the perimeter offices...

Read More

Medical Clinic Renovations at Scott Air Force Base

  |     |   No comment

Challenge The 932nd Aerospace Medicine Squadron, along with two other squadrons, were collocated in a lower level of a hospital building at Scott Air Force Base. Lack of space was a common obstacle as the number of personnel assigned to squadrons continued to grow. To alleviate the overcrowding...

Read More